Technical work

2024:

  • Installation of a battery monitoring system
  • Replacement of the shoreside charger
  • Decorative frame of one of the windows sits now in bolts and insert nuts and not wood screws

2023:

  • Installation of a bowsprit
  • Setting up of the first solar panel and its regulator

2022:

  • Replacement of the log’s propeller
  • Replacement of the sprayhood window (professional)
  • Replacement of the cutoff-releais
  • Beginning the replacement of seals in the teakdeck

2021:

  • Replacement of the rudder bearing seal
  • Replacement of the cutlass bearing
  • New anchor, a Delta 20kg, with 30m chain
  • Old antifouling completely removed, put a new “hard” one”
  • Replacement of the light in the “corridor” in LED
  • Installation of a voltimeter and a current measurement over a shunt. This concludes the exchange of the electrical system
  • Installation of a diesel heating

2020:

  • New genua
  • Replacement of the electrical panel
  • Replacement of the lazarette lid
  • Installation of LED stripes in the cabins

2019:

  • Exchange of the salon lighting to LEDs, installation of the voltage staibilizer for the LEDs
  • Separate electrical installation of the lights on the mast: top light, motor light and deck light can be switched on separately now
  • Installation of a Separ Diesel filter (professional)
  • Installation of a coolwater filter (professional)
  • Exchange of the exhaust water collector (professional)
  • Replacing of the electric toilet by a manual one
  • Exchange of the headsail roller (professional)
  • Exchange of all throughhulls and valves (professional)
  • Installation of an AIS receiver

2018:

  • Installation of a smoke detector and a CO-detector
  • Installationn of an automatic bilge pump
  • Lazy Jacks